*FAQ's & Knowledge-base (Cy... - Question #175
Where can I find out more about stormwater BMP's for construction activities? 
http://www.ocwatersheds.com/ConstructionActivities.aspx
Stormwater, Clean Oceans, & Pollution Prevention
The County of Orange publishes all the construction related BMP on their website at the following link in PDF format:

http://www.ocwatersheds.com/ConstructionActivities.aspx 

 OC Watersheds Construction Activities

A number of documents are available on these pages that describe the regulations and programs aimed at preventing and controlling the discharge of pollutants to the municipal stormdrain system and receiving waters. Orange County lies within two different regions of the State Water Quality Control Board's jurisdiction: the Santa Ana Regional Water Quality Control Board and the San Diego Regional Water Quality Control Board.

    If there are any questions regarding the details of a document, or to obtain a hard copy or other alternative formats of the original document, or to have a document read to you, please contact the OC Public Works offices, Monday through Friday, 7:00 am to 5:00 pm PST, at 2301 N. Glassell St., Orange, CA, 92865 or by email at phone icon OC Watersheds, or by phone at phone incon(714) 955-0603. 

    * Orange County Stormwater Program Construction Runoff Guidance Manual:

    Erosion Controls BMPs:

        * EC-1 Scheduling
        * EC-2 Preservation of Existing Vegetation
        * EC-3 Hydraulic Mulch
        * EC-4 Hydroseeding
        * EC-5 Soil Binders
        * EC-6 Straw Mulch
        * EC-7 Geotextiles and Mats
        * EC-8 Wood Mulching
        * EC-9 Earth Dikes and Drainage Swales

    Non Stormwater BMPs:

        * NS-1 Water Conservation Practices
        * NS-2 Dewatering Operations
        * NS-3 Paving and Grinding Operations
        * NS-4 Temporary Stream Crossing
        * NS-5 Clear Water Diversion
        * NS-6 Illicit Connection/Discharge
        * NS-7 Potable Water/Irrigation
        * NS-8 Vehicle and Equipment Cleaning
        * NS-9 Vehicle and Equipment Fueling
        * NS-10 Vehicle and Equipment Maintenance
        * NS-11 Pile Driving Operations
        * NS-12 Concrete Curing
        * NS-13 Concrete Finishing
        * NS-14 Material Over Water
        * NS-15 Demolition Adjacent to Water
        * NS-16 Temporary Batch Plants

    page top icon

    Sediment Control BMPs:

        * SE-1 Silt Fence
        * SE-2 Sediment Basin
        * SE-3 Sediment Trap
        * SE-4 Check Dam
        * SE-5 Fiber Rolls
        * SE-6 Gravel Bag Berm
        * SE-7 Street Sweeping and Vacuuming
        * SE-8 Sandbag Barrier
        * SE-9 Straw Bale Barrier
        * SE-10 Storm Drain Inlet Protection
        * SE-11 Active Treatment Systems
        * SE-12 Temporary Silt Dike
        * SE-13 Compost Socks and Berms
        * SE-14 Biofilter Bags

    Tracking Control BMPs:

        * TC-1 Stabilized Construction Entrance/ Exit
        * TC-2 Stabilized Construction Roadway
        * TC-3 Entrance/Outlet Tire Wash

    Waste Management BMPs:

        * WM-1 Material Delivery and Storage
        * WM-2 Material Use
        * WM-3 Stockpile Management
        * WM-4 Spill Prevention and Control
        * WM-5 Solid Waste Management
        * WM-6 Hazardous Waste Management
        * WM-7 Contaminated Soil Management
        * WM-8 Concrete Waste Management
        * WM-9 Sanitary/Septic Waste Management
        * WM-10 Liquid Waste Management

    Wind Erosion BMPs:

        * WE-1 Wind Erosion Control

    Appendices :

        * Appendix B: Stormwater Pollution Prevention Plan Outline
        * Appendix C: Rain Event Action Plan Template
        * Appendix D: Field Monitoring and Analysis Guidance


Created on May  4, 2010 at 10:09 AM (PDT). Last updated by CityEngineer on May  4, 2010 at 10:12 AM (PDT). Owned by CityEngineer.
Public Works Director
Public Works Director
Show fields from Show fields from Show fields from a related table
Report Name *
Description
Reports and Charts Panel
Each table has a panel listing its reports and charts, organized in groups.
Please wait while your new report is saved...
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quickbase often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quickbase finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quickbase needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.

We're glad you're interested in doing more with Quickbase!

Now we need to make you official before you share apps or manage your account.

Verifying your email lets you share Quickbase with others in your company.

Your work email
Your company